Tornado Drill/Procedure for Manufacturing Facility

Hi everyone!
I am trying to redo our tornado drill procedure for my site. We are a manufacturing facility, about 120 people on 1st shift in 1 building. Currently with the procedure we have, the location that is listed is in the middle of the facility in (3) adjacent rooms. These rooms stay at about 50 degrees however they were chosen due to location and cement walls. At this point, with the amount of people as well as temperature of the room I am trying to redo our procedure. The rooms/material do not allow for this amount of employees. I would love to hear what other people are doing for this. The main questions I have:
1) do you have a central location for ALL employees to go?
2) if not, are there designated locations OR do you have people shelter within their areas?
3) do you do a roll call/head count?

I'm really struggling working out logistics for this. Facility is about 325,000 square foot as well. Thank you all in advance and Happy Friday!!

Share

Comments (9)